The purpose of this step-by-step guide is to ensure that a customer applying for water service 1) Knows the approximate time frame for process; 2) Knows what information TMWA will need to process; 3) Contacts independent contractors in a timely fashion; 4) Receives new water service meeting all requirements.

  1. Customer Application
  2. Engineering and Resource Review
  3. Distribution Design
  4. Pre-Construction Meeting
  5. Construction and Inspection
  6. Initiating Service

Step 1: Customer Application

A new customer needs to submit the New Business Application to a project coordinator (PC). Appointments are encouraged, walk-ins may have a wait. The PC assigned to your project will be your point of contact and is responsible for facilitating your application through the process.

Step 2: Engineering and Resource Review

The Fee Schedule details specific costs and fees related to new water service. (Does not include costs associated with acquiring appropriate water rights). The following items will occur during the Engineering and Resource Review:

  • Customer pays Engineering fees at time of application. All other fees to be paid at time of signed contract.
  • Water resource, engineering and right of way reviews occur simultaneously.
  • Water rights may be needed. Fees can include purchase of water rights, water meter retrofit fund fee, Carson Sub Conservancy fund-Newlands project water rights fund and Will-Serve documentation preparation fees.
  • Will-Serve letter issued after engineering completed and water right fees are paid.
  • Nevada Administrative Code(NAC)Compliance-TMWA must prepare information for the local health authority regarding the proposed water system and availability of service to planned unit developments and subdivisions of land at the tentative and final map stages.Health Department Submittal

Step 3: Distribution Design

TMWA staff approves civil distribution designs per standards.

Initial review is red-lined and returned to applicant for revisions.

Please see the Blueprint Requirements below and the Drawing Templates for more detail.

Note: Design standards are TMWA specified distribution components and construction standards including backflow.

Submittal Requirements:
  • 2 complete stamped sets of civil plans, including permanent and temporary landscape and TMWA's water drawing(W-1,...)-(template previously provided).
  • Initial submittals may be marked as preliminary however, grading plans must be at or near final design.
  • 2 separate TMWA water drawing(W-1,...)
  • 1 electronic copy of full civil set, including landscape, grading, et al.
  • TMWA redlines from previous review.
  • Other helpful links that may assist you in obtaining additional permits. For Railroad permits, see http://www.uprr.com or for Nevada Department of Transportion, see http://www.nevadadot.com
  • For Sierra Pacific electric or gas see: http://www.sierrapacific.com/services/business/new_construction/

Step 4: Pre-Construction Meeting

Pre-Construction meetings are required for all subdivisions and commercial projects with mains. TMWA will schedule & facilitate pre-construction meeting. TMWA will schedule a pre-con once addresses have been supplied. Attendees can include customer, civil engineer, contractor, project coordinator, inspector, system engineer, backflow technician and other utilities.

Required Documents for Pre-Construction Meeting:

Customer Documents

TMWA Documents
Architectural civil drawings Base Maps
Load calculations Distribution Maps
Site plans Other data as needed
Any other relative data

Step 5: Construction and Inspection

Construction occurs and a TMWA Inspector initiates the following:
  • Initial inspection.
  • Provide punch list of incomplete items or actions required.
  • Final inspection to ensure completion of punchlist items.
  • Inspects locked out water setters.
  • Accept facilities.
  • Request for survey & right of way recordings.
  • Upon completion of project, TMWA inspector will return redline as-builts to TMWA mapping.

Step 6: Initiating Service

The end-use customer applies for service turn-on at TMWA. A TMWA water serviceman will complete the following:

  • Installs badger water meter by TMWA.
  • Connects meter reading electronic device (ERT), records meter read, meter number, and ERT number on Meter Control Record.
  • A qualified independent backflow tester through Washoe County Health Department
    inspects & tests backflow assembly (non residential and irrigation) and submits test results to TMWA.
  • Completes paperwork to set up billing through TMWA.
  • $25.00 turn on fee will be incurred on TMWA bill for re-inspection of TMWA meter facilities.

Quick Links to New Construction Documents

 

 

Frequently Asked Questions




Got a question about your water? Ask it here.


As a customer, what can I do to help TMWA keep rates in check?

Can I make payment arrangements on my monthly bill?

Can I pay my bill at grocery stores?

Can I pay my bill online or on the phone free of charge?

Does TMWA have a drop box?

How can I get my water tested?

How do I find out more about water quality?

How much water does an average household use per year?

I am moving. Who do I contact to update my billing information or cancel my water service?

I have a new dishwasher and want to know the hardness of water.

Is the water saved by current residents used for new development?

My water is dirty or is brown. What is going on?

My water tastes or smells different. What can I do?

Please explain the different charges on my water bill.

What are TMWA's Rules?

What happens to any water saved through conservation? Does it go to serve growth?

What is TMWA's service territory?

What is the Right-of-Way Toll?

What is the regional water management fee?

What methods of emergency disinfection of drinking water are available?

Where can I find the TMWA Rules?

Why is my bill so high?

Why would the pipes have any sediment in them anyway, why would they have to be flushed, and how can I get rid of the dirty water?

Will TMWA charge for water meters when they become mandatory?


right shadow